Etabs 9.7.1

The seismic weight of each floor is its full dead load plus appropriate amount of imposed load. Pushover curve and capacity spectrum curve of 5 storey frame structure www. Any weight supported in between the storey shall be distributed to the floors above and below in inverse proportion to its distance from the floors. In themodal,in X- direction and Y- direction, each of 5m in length and the support condition was assumed to be fixed and soil condition was assumed as medium soil.

Uploader: Arashishura
Date Added: 3 December 2008
File Size: 50.12 Mb
Operating Systems: Windows NT/2000/XP/2003/2003/7/8/10 MacOS 10/X
Downloads: 1898
Price: Free* [*Free Regsitration Required]





Pushover curve and etzbs spectrum curve of 5 storey frame structure www. The program includes several built-indefault hinge properties that are based onaverage values from ATC for concretemembers and average values from FEMA for steel members. B, Non-Linear static analysis of multi-storied building, International journal of engineering trends and technology ILETT — volume 4 issue oct As at performance point, hinges were in LS-CP range, overall performance of building is said to be Life safety to Collapse prevention level.

Formation of Plastic hinges at step 12 V1.

The typical floor height is 3m. Static approximation used in the pushover analysis.

Enter the email address you signed up with and we'll email you a reset link. It has been observed that, on subsequent push to building, hinges started forming etabz beams first.

D 1 1 Assistant professor, Dept. Any weight supported in between the storey shall be distributed to the floors above and below in inverse proportion to its distance from the floors. Modeling of the structure — 5 storey Fig F.

Pushover analysis of RC frame structure using ETABS | santhosh D - appsmarketing.mobi

Pushover Analysis After assigning all properties of the models, thedisplacement —controlled pushover analysis of the modelsare carried out. All slabs were assumed as Membrane element of mm thickness. Comparison of maximum displacement of 5, 10, 15 99.7.1 VII.

The models are pushed in monotonicallyincreasing order until target displacement etxbs www. The seismic zone assumed as zone IV. In Pushover analysis structure is subjected to monotonically increasing lateral load until the peak response of the structure is obtained as shown in figure Fig A.

ETABS Version: 9.7.1 Download

While computing the seismic weight of each floor, the weight of columns and walls in any storey shall be equally distributed to the floors etaabs and below the storey. There will be spalling of concrete cover and shear cracking in the ductile columns 2. Plan of Structure Fig D: Skip to main content. Formation etavs Plastic hinges at step 10 www. Formation of Plastic hinges at step 10 Fig N.

The pushover analysis is a method to observe the successive damage state of the building.

Etabs - Download | Civil Engineering Blog

To achieve this objective, three RC bare frame structures with 5, 10, 15 stories respectively were analyzed. Help Center Find new research papers in: Modeling of the structure — 5, 10 and 15 storey Fig I. Remember me on this computer. In the primary concrete frames, there will be extensive cracking and formation of hinges in the ductile elements Performance point — The performance point is the point where capacity curve crosses demand curve.

Etasb curve and capacity spectrum curve of 10 storey frame structure Table 3. Click here to sign up. The performance levels are as follows: Pushover analysis is a non linear static analysis used to determine the force-displacement relationship, or capacity curve, for a structural element. Results and Graphs Fig E.

The details of beams and columns are shown in table 1.

1 Comment on "Etabs 9.7.1"

  1. You are absolutely right. In it something is and it is good thought. It is ready to support you.

  2. Zoloshura | 26.10.2018 at 00:42 | Reply

    In my opinion you are mistaken. I suggest it to discuss. Write to me in PM.

  3. Meztinos | 29.10.2018 at 09:59 | Reply

    It agree, the helpful information

  4. You are mistaken. I suggest it to discuss. Write to me in PM, we will communicate.